How It Works

A Forward View in the First Week

You know the scope, the fee, and what your books need before you commit, and the readiness assessment already shows you the next ninety days.

How an Engagement Begins

Three steps. The first one costs nothing.

  1. Step 1

    Introductory Call

    Thirty minutes on how your company runs: your accounting system, how jobs are tracked, and what you need to see. No cost, and if I am not the right fit, I will say so.

  2. Step 2

    Readiness Assessment

    A written review of your books, account by account, with what each item makes possible, quoted in writing before you start. It comes with a preliminary Next 90 Days page built from your receivables, payables, and a first job sheet. Your bookkeeper or CPA makes any changes.

  3. Step 3

    Monthly Reporting Begins

    Your first full pack, then a 30-minute call: last month's flags first, then this month's four, then what you need to decide. Then the same every month, the Monday after your job sheet is in.

How I Work

Your Books Are Never Changed

I read your accounting records and report on them. I do not enter transactions, post adjustments, or do bookkeeping, and your bookkeeper and CPA stay where they are. I use read-only access wherever your accounting plan offers it, and where it does not, I still make no changes. I keep my own log of every time I access your books and what I pulled, and send it with each monthly report.

A Fixed Monthly Fee

No hourly billing. The scope and fee are agreed in writing before work begins, so my fee is known in advance.

Your Odds, Not Mine

The revenue forecast uses the win probability you give me for each bid. I never guess your win rate, and the pack shows your odds next to what you actually won so you can adjust them.

Your Data Stays Separate

Each client's files are kept in a separate, access-restricted folder, and in a separate Power BI workspace where your team has interactive reports, on an encrypted computer used only for York Advisory. Your information is never combined or shared with another client's.

The Same Method Every Month

Percent complete, earned revenue, and billing position are calculated the same way every month, so this month's pack compares directly to the last.

Four Flags, Ranked

Four flags, ranked, with what to do about each: the job, the dollar amount, the action, and the date. Anything else I see is listed underneath, so nothing is hidden. The ranking is the advice.

Frequently Asked Questions

Why not just my CPA? Do you replace them?

No. Your bookkeeper keeps the books and your CPA does the official numbers: reviewed statements, the year-end WIP, and your taxes. I report on every job every month and forecast the next ninety days, while there is still time to act. When something needs fixing, I tell you what and why so they can make the change before year end, not during it.

Can't software do this now?

Software can draw these pages. It does not know your project manager's cost-to-complete is light, it does not hold your bid odds to your own record, and it does not call next month to ask whether you fixed last month's problem. The books do not contain those things. I collect them, check them, and follow up.

Where do the forecast numbers come from?

Cash comes from open receivables and payables, your billing schedule, payroll, and overhead. Revenue comes from your backlog and the pipeline you give me, at your odds. Crew comes from your roster and what your company has earned per field hour over the last twelve months, and superintendents from who is running which job.

Does this help my bond line?

Your surety underwrites your CPA's statements and the WIP schedule. The quarterly package gives them that schedule in a surety format, labeled as a management report. The Next 90 Days page is your planning tool, not part of the bond file.

Which accounting systems do you work with?

Reporting runs on QuickBooks Online, which is where my expertise is. On something else? Ask, and I will tell you honestly whether it fits.

How much time does this take from my team?

At the Owner level, a short job sheet, your pipeline, and your crew roster, designed to take under twenty minutes a month after setup. Higher levels add inputs from your project managers.

How long until the first report?

The readiness assessment includes a preliminary Next 90 Days page. If your books are clean, the first full pack arrives about a week after the assessment and covers your most recent closed month. If they need work, the assessment lists exactly what is needed so you can get a quote from your bookkeeper or CPA. The full pack follows once the changes are made.

You have a day job. How does that work?

I am a controller at a commercial general contractor. I keep a small client list by design, and I do not take on clients who bid work to the company I work for, or who compete with it for the same work. Before I take on any client, I run a written conflict check. I close my employer’s books during the workday. Your reports are built over the weekend and land Monday morning, and calls and emails are returned the same evening.

What if your WIP and my CPA's disagree?

My WIP uses percent complete on a cost-to-cost basis. If your CPA's year-end numbers differ, I reconcile the difference with them line by line, and the next report follows the year-end figures. Your CPA bills you for their time on the reconciliation.

What happens if we stop working together?

I remove my access within one business day, delete my local copies, and send you written confirmation.